No Retrofitting
Compatible with Siemens, ABB, Schneider VFDs/soft starters. Supports Modbus-RTU / 4G DTU / IEPE vibration sensor input. No pump modification, no pipeline shutdown.
Compatible with centrifugal, submersible, and inline pumps supporting Modbus / MQTT / IEPE vibration sensors. AI analyzes vibration spectrum, bearing temperature, motor current and seal status in real-time — early detection of imbalance, misalignment, bearing wear, and cavitation. Graded alerts, closed-loop work orders.
Compatible with Siemens, ABB, Schneider VFDs/soft starters. Supports Modbus-RTU / 4G DTU / IEPE vibration sensor input. No pump modification, no pipeline shutdown.
Proprietary AI learns each pump's operational baseline — identifies vibration signatures of imbalance, misalignment, bearing wear, looseness, and cavitation. 2-3 week advance bearing fault warning, far fewer false alarms vs. fixed thresholds.
Temperature + vibration + current jointly assess mechanical seal degradation. Combined with flow/pressure anomaly detection to identify pipe leakage and pump efficiency decline — avoiding water and energy waste.
Real-time monitoring of 3-phase current imbalance, overload rate, power factor and temperature rise. Early warning for phase loss, inter-turn short circuit, broken rotor bars — preventing motor burnout.
Circulating pump failure paralyzes cooling systems. Water supply disruption halts entire plant operations. Bearing burnout and seal failures strike without warning — repairs cost tens of thousands, hourly downtime losses in the thousands.
Pumps account for 15-30% of factory electricity. Impeller wear, improper valve settings, pipe scaling cause 10-20% efficiency loss — nearly impossible to detect manually, electricity costs silently wasted.
Multiple pump models, diverse suppliers. Wear parts like mechanical seals and bearings have high inventory but key models are frequently out of stock. Without fault trend prediction, spare parts planning relies on guesswork — either capital tied up or production halted waiting for parts.
Based on 6 critical pumps, ¥3,000/hr downtime cost, failures reduced from 4 to 1/year
Patrol reduced from 2 to 0.5 person/day, significant labor savings in water treatment workshops
Pump efficiency optimization + condition-driven spare parts planning, reducing wasteful maintenance and energy loss
Fill in below. Our solution engineer will respond same-day with industry case studies and ROI calculation.